Electrification of the NCCC Secretariat

A net-metering demonstration project featuring a 22.5kW solar PV system at the NCCC Secretariat.

2024 Pilot Phase Partner: National Council on Climate Change
Electrification of the NCCC Secretariat

The Challenge

The NCCC Secretariat lacked a reliable, low-carbon power supply to model the clean energy transition it champions nationally.

Our Approach

Green Protocol designed and installed a 22.5kW net-metering solar PV system, integrating it with the Secretariat's existing grid connection for seamless offset billing.

The Outcome

The Secretariat now operates on a majority-solar power mix, serving as a live case study for other federal institutions.

Action in the Field

Electrification of the NCCC Secretariat, field photo 1Electrification of the NCCC Secretariat, field photo 2Electrification of the NCCC Secretariat, field photo 3Electrification of the NCCC Secretariat, field photo 4Electrification of the NCCC Secretariat, field photo 5Electrification of the NCCC Secretariat, field photo 6